Drop your Microsoft Project or Primavera P6 file. Free health score in about 10 seconds, graded against the DCMA 14-Point Assessment and 7 more federal and industry standards. The paid report adds your odds of finishing on time.
Drop your schedule to score it free
.mpp, .xml, or .xer • click to browse • about 10 seconds
Your file is deleted the instant it’s scored. Never stored or shared. How we protect your data
SCORED · DIAGNOSED · PRIORITIZED
Schedule Health Score
riverside-office-tower.mpp
Check results
Fix steps locked
Full report shows offending tasks + exact steps
Every score runs the same 17 structural checks. They fall into three buckets.
Missing predecessors and successors, open ends, leads and lags, and whether the network is well-connected enough to predict slippage.
Hard constraints and negative float that override the logic and quietly break the critical path.
Over-long tasks, insufficient detail, and unresourced work that hide where a schedule is really slipping.
Every scan runs the complete DCMA 14-Point Assessment (the same framework federal agencies use to vet contractor schedules), plus 3 GanttScore checks that go beyond it. Findings are then measured against the published criteria of the guides program reviewers actually work from, so you see what an auditor would see before they do. See all 17 checks
Most tools check the DCMA 14 and stop. GanttScore measures your schedule against the published criteria of the federal and industry guides reviewers actually use, and reports every finding, not just a pass/fail.
Public federal guides are named as published; industry recommended practices are referenced as “aligned with.” GanttScore evaluates against these criteria and does not claim certification or endorsement.
No account setup. No waiting. The same 14 checks federal agencies use to vet contractor schedules, plus 3 of our own.
Drag a .mpp, .xml, or .xer file onto the page. No account required. No credit card. Files are deleted the instant scoring completes.
Our engine parses your schedule and runs all 17 structural checks simultaneously (the 14 DCMA checks plus 3 additional value checks) in about 10 seconds.
See a 0-100 health score, pass/fail on every check, and which failures hurt your score most. Upgrade to get step-by-step fixes.
Want to see a real report before you upload? View the sample report →
Your .mpp file is parsed in memory and deleted the moment scoring completes. We never store project files.
Drop a file, get a score. No signup and no email required to see your pass/fail results across all 17 checks. Want to keep the link? We'll email it to you.
Free score. $300 full report. $750/year Annual. No sales calls. No demo required. Prices are on the pricing page.
GanttScore accepts Microsoft Project files (.mpp), XML schedule exports (.xml), and Primavera P6 XER files (.xer). Maximum file size is 50 MB.
Your schedule file is parsed in memory and deleted the moment scoring completes. It never touches a database. The only data we keep is your score, the check results, and the file's name to label your result.
The DCMA 14-point assessment is a standardized checklist developed by the Defense Contract Management Agency to evaluate whether a project schedule is logically sound and executable. Federal agencies use it to vet contractor schedule submissions. We built our engine on these 14 checks plus 3 additional value checks.
No. Drop a file and your full free scorecard appears: no account, no signup, no email required to see it. Enter your email if you want the link sent to you (results pages expire in 24 hours), or at checkout if you buy the full report.
The score is a direct output of structural analysis on your file. It reflects what is in the schedule (logic gaps, constraint overuse, float problems), not our opinion. If your schedule has clean logic, it will score well.